Digital Renderings of Oviedo Medical Center

“Our community has waited a long time for a hospital in Oviedo and now it is becoming a reality,” said Oviedo Mayor Dominic Persampiere. “We are grateful to Central Florida Regional Hospital for staying the course with us and look forward to working with them to build a comprehensive medical center we can be proud of that will provide all the healthcare services our residents need right here in our own community.”*

Gould Turner Group has completed the design for the new 64-bed Oviedo Medical Center to be built on 48 acres in Oviedo, Florida. Construction of the new facility will begin Fall 2015, and it is expected to open by Fall 2016. The new hospital will integrate the existing freestanding emergency center on site, which opened in 2011. Oviedo Medical Center will provide full service healthcare to the area including, diagnostic, surgical, laboratory, and pharmacy services. The patient care areas will include 48 Medical/Surgical beds, 10 ICU beds, and 6 Labor Delivery suites. The building is structured to add an additional 120 beds in the future as the needs of the community grow.

185,177 Square Feet
Opening Fall 2016

*From: http://oviedomedicalcenter.com/campaigns/oviedo-medical-center

Recent Posts

MISSION

GOULD TURNER GROUP |  Providing creative and thoughtful designs that empower communities to thrive.

VISION

Our vision is to improve all lives through design.

We believe that architecture has the power to profoundly impact the quality of our lives. Whether it is for a patient in a hospital, a teacher in a classroom, a student on a play yard, or a person at work, Gould Turner Group's vision is to use design as an instrument of positive change that makes the lives of those we touch that much better.

 

 

 

GUIDING PRINCIPLES

Teamwork
Passion for design
Quality in all we do
Respect for one another
Integrity in every action we take
Service to our clients
Continual improvement